From Idea to Production in Four Weeks
A one-week Spec Sprint, then a fixed-price build of about three weeks. Tested, documented, deployed, and in your repository.
Who This Is For
Startups, founders, or teams
With an idea or design files
No working backend yet
Starting from scratch or early concepts
Need to move fast
Without creating tech debt
How It Works
Spec Sprint
One week, £4,000 fixed. We produce the master specification, architecture document, data model, wireframes for key screens, and a backlog cut into four-hour items.
Fixed-Price Quote
The build is quoted from the backlog the sprint produced, before you commit. 50% of the sprint is credited against the build if you proceed within 30 days.
Build
About three weeks, from £15,000 fixed. Items run in order in your repository, and specification changes propagate downstream before the next item starts.
Test Gate and QA
We install and enforce your project's test gate. Every item ships with a generated demo and before/after screenshots, and the deployed application gets independent black-box testing.
Deploy
Deployed from your repository. Every run records which model processed which code, so you can see exactly what happened.
Ongoing Support
Optional, £2,000 per month, once the build is live.
What It Costs
Fixed prices, stated up front. The build price comes from the backlog the sprint produces, before you commit.
Spec Sprint
- Master specification
- Architecture document
- Data model
- Wireframes for key screens
- Backlog cut into four-hour items
- Fixed-price build quote
Build
- Quoted from the sprint backlog before you commit
- Delivered in your repository
- Enforced test gate and independent black-box testing
- A generated demo on every task
Ongoing Support
- Optional, after the build is live
What the Spec Sprint Delivers
Perfect For
Funded Startup
Ship a production MVP in about four weeks, at a price fixed before the build starts.
Innovation Team
Align stakeholders on a specification and wireframes before build spend.
Non-technical Founder
We guide you step by step, no jargon.
Ready to Start Your Greenfield Project?
A one-week Spec Sprint is the first step. You own the output either way.